Service · Westside & South Bay

Construction Debris Removal Los Angeles

We haul drywall, tile, lumber, old cabinets and small concrete loads from remodels, ADU builds and fire rebuilds across the Westside, the coast and the South Bay, often the same day. Text a photo of the pile and of the driveway to (310) 905-5138; Miles replies with one number that already includes the carry and the transfer-station fees.

What we take

  • Drywall, plaster and lath
  • Tile, stone and small concrete loads
  • Lumber, trim and old cabinets
  • Roofing and siding offcuts
  • Flooring, carpet and padding
  • Windows, doors and fixtures
  • Dirt and sod in modest amounts

What we don't

  • Asbestos, lead paint chips, fire ash
  • Full demolition work (we haul, we don't demo)
  • Dumpster rental
  • Hazardous liquids

What construction debris removal looks like on the Westside

Contractors text us from three kinds of jobs. The first is the kitchen or bath remodel in a 1950s Mar Vista ranch or a Cheviot Hills Spanish: demo'd cabinets, backer board, cracked tile and a cast-iron tub sitting in the driveway because the roll-off the general contractor ordered doesn't land until next week. The second is the ADU or teardown north of Venice Boulevard and in 90025, where the framing crew leaves cutoffs, bent nails and a leaning stack of broken drywall that nobody wants to pay a carpenter to load. The third is the Hill Section of Manhattan Beach and the '-crest' drives of Beverly Crest, where a whole-house remodel throws off a fresh pile every week and the street is too narrow for a dumpster to live on.

Since 2025 there is a fourth. Pacific Palisades and the east end of Malibu are rebuild zones. The ash and the burned-structure debris were cleared under the federal and county program run by the Army Corps of Engineers, so that part is done. What's on the lots now is rebuild waste: framing offcuts, drywall scrap, roofing and siding bundles, the cardboard and foam that windows and fixtures arrive in, and hardscape torn out ahead of new foundations. We're the truck that shows up between dumpster swaps so the site stays clean enough for the next inspection.

How a construction debris pickup works

Send photos of the pile from two angles, plus one of where a truck can get to, to (310) 905-5138. For debris we ask one extra question: is there concrete, tile, plaster or dirt in it, and roughly how much? Those are the heavy materials, and a half-yard of broken slab changes the load even when it looks small in the picture. Miles replies with one number for the truck space, adjusted for weight when the load is mostly heavy material. The carry and the transfer-station fees are inside it.

Two people arrive with contractor bags, a wheelbarrow, a flat dolly and a magnet sweeper for nails. Loose drywall and tile get bagged on site so they don't dust the truck bed or your neighbor's driveway. Lumber is stacked by length so it rides flat. Cabinets ride whole unless they're coming out of a second floor or a basement, in which case we knock the boxes down at the door. You don't need to sort anything first, but if you keep clean lumber and metal in their own piles, they can go to a recycler instead of the mixed load. A driveway pile that fills a quarter of the truck takes about 30 minutes. A full truck pulled out of a gutted condo is closer to two hours. Remodels that run for weeks can book a standing pickup on the same day each week so the pile never gets ahead of the crew.

Load sizes for construction debris

LoadWhat it usually is
Small loadA bathroom demo: vanity, toilet, tile off one wall, a few bags of drywall
Quarter truckA kitchen's worth of old cabinets and countertop, or one room of drywall and flooring
Half truckA whole-apartment flooring tear-out, or a week of framing scrap from an ADU build
Three-quarter truckA gutted kitchen plus two baths, with doors, trim and fixtures
Full truckA week's pile from a whole-house remodel, or a roof tear-off on a small house

Concrete, tile, plaster and dirt are the exception to space pricing. The truck has an axle limit, so we cap how much of the bed those materials can fill. A pile of broken slab that looks like a quarter truck may be quoted as a half because of what it weighs. We say so before you book, not when we're standing in the driveway.

Where the debris goes

Construction debris doesn't get donated, with a narrow exception: intact cabinet boxes, solid doors, undamaged sinks and working light fixtures. We set those aside at the job and take them to a building-materials reuse outlet when one will accept them. Goodwill and The Salvation Army take furniture and household goods, not building materials, so they're not the stop for this load.

Everything else is sorted at a transfer station on the way back. Westside loads go to Southern California Disposal & Recycling on Frank Street in Santa Monica or the Culver City Transfer & Recycling Station on West Jefferson Boulevard, which is the short run from Mar Vista and Del Rey. South Bay loads go to the Gardena transfer station on West Rosecrans Avenue. Malibu loads usually run east to Frank Street. Clean concrete, brick and tile are kept separate as inert material so they can be crushed for road base instead of buried. Metal studs, copper pipe, rebar and old sinks go to a scrap yard. Carpet, padding, mixed drywall and painted wood ride in the general load.

If your project is permitted in the City of Los Angeles and your inspector asks for construction and demolition diversion paperwork, tell us when you book and we'll ask the station what weight tickets it can issue for your load.

Access situations we plan for

  • Burn-zone streets: Palisades streets between Bienvenida and the Alphabet Streets still carry K-rail and a steady run of lumber trucks. We stage short, load fast and clear the lane. Palisades Highlands and Castellammare are steep and the Highlands is gated, so leave the code in your text.
  • PCH: the highway runs at 25 mph through the Malibu burn zone, and beachfront lots load from the shoulder or a private road. We time Malibu pickups for mid-morning, after the construction rush and before the beach traffic, and we pull in with the flow, never against it.
  • Hill Section and hillside drives: Manhattan Beach's Hill Section, Beverly Crest and the canyon roads north of Sunset in Brentwood have steep, narrow driveways where a roll-off can't be dropped. The truck stays at the street and the debris comes down by wheelbarrow and dolly, which is already in the quote.
  • Walk streets: on the Venice canals, in the Sand Section and on Hermosa's walk streets, the truck cannot reach the front door. For debris that means wheelbarrow runs from the nearest cross street, so we bring a third person for anything past a quarter truck.
  • Condo and office towers: a Wilshire Corridor or Century City tenant-improvement job means a loading-dock window, a padded elevator and a certificate of insurance on file with management. We send the COI the day before and work inside the dock hours.
  • HOA streets: Beverlywood's CC&Rs, Playa Vista and the North Redondo townhome complexes don't allow a debris pile at the curb for long. We'll come the same day the demo finishes so nothing sits overnight.

When the city program covers it, and when it doesn't

Short answer: for construction debris, almost never. The City of Los Angeles gives residents free bulky-item pickup through 311, and it's a good program for a couch or a water heater. Its list is household items, not building materials, so a pile of drywall and tile at a Venice or Westchester curb won't be collected and may draw a notice instead. The incorporated cities say it outright. Beverly Hills' on-request pickup does not accept construction materials. Torrance's Large Item Pick Up excludes construction debris. Hermosa Beach's hauler excludes dirt, concrete, tile, drywall and loose lumber. Culver City's appointment pickup turns away dirt, rocks, bricks and concrete, and the appointment wait runs about two weeks. Santa Monica caps its free program at three pickups a year of five items each, and a pile of drywall would use up a year's allowance in one visit.

The one city program worth knowing for debris is Torrance's self-haul discount: residents with proof of address can take their own loads to the Gardena transfer stations on West Rosecrans Avenue and West Compton Boulevard at a reduced rate, as the city lists it for 2026. If you have a pickup truck and a free Saturday, that's a fair option. If you don't, or the pile is more than a pickup bed, that's us. Read more on how our photo pricing works.

Remodel season and the rebuild phase

Westside remodels start in spring and run through the summer, when contractor piles start stacking up. Book a standing pickup in March and you'll keep the slot through September. The Palisades rebuild runs year-round: the city had approved 3,090 building and electrical permits by January 2, 2026, 563 of them for new buildings, and Malibu had issued its 100th rebuild permit with 41 homes under construction, with Big Rock's first post-fire certificate of occupancy in June 2026. Every one of those lots generates framing and drywall waste for months.

From November through March, watch the forecast. An open debris pile gets rained on, and wet drywall and carpet weigh noticeably more than they did dry, which changes the load. If rain is coming, text us the day before and we'll take the pile dry. Storm debris itself, downed fences, mud-caked furniture and flood-soaked flooring, is on our storm and fire debris page.

Debris Removal questions

Do you take concrete and tile with construction debris in Los Angeles?

Yes, in small loads. Broken slab, pavers, tile and plaster are heavy, so we cap how much of the truck they fill and tell you in the quote. A few wheelbarrows of concrete from a patio or a footing is routine; a full driveway tear-out is better served by a roll-off, and we'll say so.

Can you pick up from a job site when the contractor isn't there?

Yes. Most of our contractor pickups are unattended. Leave the pile where the truck can reach it, text us a photo and the gate code if there is one, and we'll send before-and-after photos when the pile is gone. Payment is by card, cash or Zelle.

What about asbestos in old plaster or drywall?

We don't haul asbestos, lead paint chips or fire ash, full stop. Older Westside homes, especially those built before the 1980s, can have asbestos in plaster, joint compound, popcorn ceilings and floor tile, so have an abatement contractor test and clear it first. Once the clearance is done, we take the rest of the demo.

Will LA's free 311 bulky pickup take construction debris?

No. LASAN's curbside program is for household bulky items like couches and appliances, not drywall, tile or lumber. Beverly Hills, Torrance, Culver City and Hermosa Beach say the same thing in their own program rules. Construction debris is a hire-a-hauler job in every city we serve.

Do you rent dumpsters or roll-off bins?

No. We're the alternative to a dumpster: a crew and a truck that load the pile and leave. That works best on streets where a roll-off can't be dropped, for small projects that don't fill one, and for the days between swaps on a big job.

How fast can a contractor get a debris pickup?

Text before noon and we can usually come today. For a remodel that runs for weeks, book a standing weekly pickup and the slot is yours until the job is done.

Can you haul rebuild debris in Pacific Palisades and Malibu?

Yes, the rebuild-phase waste: framing scrap, drywall, roofing, packaging and hardscape. The ash and burned-structure debris were handled by the government cleanup programs, so we're not touching that. We work around K-rail on the Palisades streets and the 25 mph stretch of PCH, and we send a COI if the site requires one.

Do you take dirt and sod?

In modest amounts, yes: the bags and wheelbarrows from a planter bed, a fence post or a small patio. We don't do excavation spoils or mud removal that needs heavy equipment. If the pile is more than a few wheelbarrows, send a photo and we'll tell you honestly whether it's a truck job or a bin job.

Do I need to sort the debris before you come?

No. We load mixed piles every day. If you do keep clean lumber, metal and clean concrete separate, they go to recyclers instead of the mixed load,.

Ready when you are

Text a photo of the debris removal. Get a price today.

Snap what's going, text it over, and we reply with a clear price, usually within the hour. No visits, no hourly rates, and if the load differs from the photos we re-quote before we lift anything.